JESSE JAMES:
ROSS 40 FT  |  SKILLS: engineering, laminate, painting  |  PROJECT DURATION: 3 weeks
A bowsprit was fabricated and installed on this Ross 40 to make is more suitable for cruising. Additionally, a retractable carbon fiber pole was built into the bow area.