Brin Wilson Boat Builders
 
  < RETURN TO RESTORATION PROJECTS


 
 
   


CIMBA:

TOWNSEND 26 FT  |  SKILLS: laminate, painting  |  PROJECT DURATION: 4 weeks

This Townsend 26 footer suffered from electrochemical deterioration which resulted in a keel joint leak. When the keel was removed, severe corrosion was discovered in the bolts - some keel bolts had corroded almost entirely away. New keel bolts were installed and the keel rebedded to the hull with a new bilge floor. Laminate was applied across the keel to hull joint, and new epoxy primer and antifouling paint applied to the entire hull under the waterline.

 

 

Home Page

Email Brin Wilson